Example report: Air conditioning — Samsung Multi Split (5 kW)
This is a real report on a submitted quote, with the company name, client and address details anonymised. This is what your own QuoteChecker report looks like.
Key finding: in QuoteChecker's independent review, this Air conditioning — Samsung Multi Split (5 kW) quote scored 6.5/10, with 2 risks and 4 points of attention identified; our recommendation to the client: Renegotiate first.
Summary
[Installation company] offers a market-conform quote for a Samsung Multi Split air conditioning system (5 kW) including installation for €3991 incl. VAT. The technical specifications are well substantiated and the warranty conditions are clear. Two points of attention require action before you agree: the missing payment terms and the open-ended additional-work provision without a cost cap.
The quote from [Installation company] is market-conform on price and the warranty conditions are solid, but two risks must be resolved before you sign. The most serious risk is the open-ended additional-work provision: the quote allows [Installation company] to add extra costs during work preparation without a maximum amount or a cancellation right for you. In addition, the payment terms and the general terms and conditions are missing entirely — request both and have an additional-work cap (e.g. max. €250 without your written approval) recorded in writing. Once these two points are resolved, this is an acceptable quote to sign.
Cost overview
| Item | Amount |
|---|---|
| Samsung Multi Split system (2,5 kW + 3,5 kW + outdoor unit) | € 2.320 excl. VAT |
| Pipework and installation (up to 10m) | € 1.061 excl. VAT |
| Extra options | € 0 |
| Subtotal excl. VAT | € 3.381 |
| VAT (21%) | € 710 |
| Discount | - € 100 |
| Total incl. VAT | € 3.991 |
| Total quote amount (indicative) | € 3.991 |
Category scores
Findings
Recommended questions for the provider
- 1.What is the Chamber of Commerce (KVK) number and VAT number of [Installation company], and can you send the general terms and conditions before I agree?
- 2.What is the payment schedule: do I pay before or after installation, and is a deposit required?
- 3.What rate do you charge per extra metre of pipework beyond 10 metres, and can you include a maximum (cap) in the quote?
- 4.Can you confirm the STEK certificate number of the engineer carrying out the work?
- 5.If additional work turns out to be necessary during work preparation, may I cancel free of charge if the additional-work amount exceeds a certain limit?
Get your quote reviewed now
Avoid regret later. An independent assessment from just $5 — no hidden costs.
Start Quick Check →